Tower Bridge

 

 

  • Client: City of London
  • Location: London
  • Integrated Services: MEP
  • Value: £1,000,000.00

 

Project Detail

CJ Design have been appointed by the City of London to upgrade the complete 40 year old mains electrical distribution to Tower Bridge serving both the lifting mechanism and internal services.
The project needs to ensure that the bridge, as required by government charter has to remain operational throughout the duration of the works and as such includes for all temporary supplies necessary.
Full liaison with English Heritage and the Listed Building Authority of the local councils is required to ensure the Grade I listing of the bridge and surrounding support buildings is not compromised.

Results

Whilst our works are effectively complete, this project awaits funding approval before commencing.

The Brief

To develop the design and procurement package for the complete rewiring of this national monument within the limitions of the operation charter

Tower Bridge

Tower Bridge