QVC

Facts

  • LocationLondon
  • ClientQVC
  • Cost£30M Construction value

Project Detail

CJDP were appointed by QVC to carry out  the MEP design and contract manage the new build of their 120,000 sq ft Head Office building in Chiswick Park, London, W4.

Originally the building was delivered to QVC as a Shell and Core. We designed the full Cat A and Cat B fit-out including live TV studios, supporting control rooms, date centre for both broadcast and IT and 96 cabinet central technical area all serviced by a Tier 3b resilient system of electrical and in-aisle casting installation.  This included HV distribution, 3x1MV standby generators, full 1MVA of UPS support and full A&B path distribution system.

The building houses 450 staff complete with a full complement of AV meeting rooms, conference areas, dining, restaurant and café facilities and necessary workstations.

To support the production of live HD TV the building also houses audio and edit suites, internet design services and technical workshops.

Brief

To provide a fully functional building to satisfy QVC’s multiple demands.

Results

This standard BCO commercial office spec building was skilfully designed, adapted and delivered to meet the needs of QVC as a broadcaster and retailer.

Integrated Services

MEP